Pfizer, Inc. |
|
· Chemical-Free Water Treatment at a Schick Facility ·
Dolphin System Installations: Cooling Towers and Boilers
|
 |
Overview of Dolphin Technology & Benefits
Began using the technology in 1994
Now all cooling towers & boilers chemical-free
Eliminated chemical treatment costs
Reduced management costs
Dramatically reduced regulatory burdens
Created a cleaner environment
Made a healthier workplace
Improved profitability in less than 1 year
|
|
Pfizer's Schick Facility in Milford, Connecticut
|
|
|
Schick, a former division of Warner-Lambert Corporation and now part of Pfizer, provides
health care and consumer products. The plant comprises about 435,000 square feet, employs
900 workers, and operates 24 hours per day, 7 days per week. At the Milford facility,
Schick makes shaving products, including safety razors and razor blades. Raw materials
include stainless steels, plastics, and specialized protective and lubricant coatings.
The razor blade manufacturing processes includes various machining, heat treating, grinding,
cleaning, vacuum vapor deposition, and coating operations.
|
Dolphin System on Cooling Tower Sidestream Application at Schick
|
Cooling Tower Test Results Under Dolphin Treatment
- pH: 7.99 (avg); controlled via blowdown rate
- Total Dissolved Solids: 183-829 ppm
- Total Bacteria Counts: 1 to 17,000 CFU/ml
- Observations:
- no odor
- no algae
- water: clear since installation
- Water Consumption: significant decrease
- Installation Date: May 1994 (first of many)
|
|
|