The Dolphin System installation at the Coffee Creek Correctional Facility called for an 8-inch (diameter) coil-pipe assembly (center foreground), along with a 2-inch unit for the make-up water.
Building management interface components were incorporated into the installation process, enabling ready monitoring and management of the Dolphin chemical-free water treatment system. Incoming water averages a pH of 7.5 and Total Dissolved Solids averaging 41 mg/L.